Title commitment · Loan documents

Clear every title item before your lien records.

Every item in a title commitment, from Schedule A and Schedule B to the exhibits, is cited to its page and set beside the term sheet, the survey, the payoff letters and the leases. Your team and your counsel clear one list, with each difference and its reason, before your lien records.

TITLE COMMITMENT · ILLUSTRATIVEEFFECTIVE 10/05/2026 · LOAN POLICY
Schedules A and B, as the title company issued them
96-UNIT APARTMENT COMMUNITY · COMMITMENT FOR TITLE INSURANCE · PAGES 1 TO 4
ITEMAS ISSUED
SCHEDULE A · PAGE 1
Policy to be issuedLoan policy
Proposed insuredLender and assigns
1Proposed amount9,000,000
EstateFee simple
2Title vested inSample Apartments Owner
3LandLot 1, Block A
SCHEDULE B, PART I · REQUIREMENTS · PAGE 2
41. Release bridge deed of trust and rents7,889,000
2. Terminate bridge lender's fixture filingRequired
3. Record the new deed of trust9,000,000
4. Survey and owner's affidavitRequired
5. Borrower authority documentsRequired
SCHEDULE B, PART II · EXCEPTIONS · PAGES 3 TO 4
1. Taxes for 2026, not yet dueStandard
2. Survey mattersUntil survey
3. Tenants in possession, unrecorded leasesStandard
4. Utility easement, 10 feet, rear lineRecorded
57. Memorandum of rooftop antenna leaseRecorded 2023
READ FROM THIS DOCUMENT, EACH FIGURE CITED
1Proposed insured amount$9,000,000Commitment, Sch. A, p. 1
2Vested inSample Apartments OwnerCommitment, Sch. A, p. 1
3LandLot 1, Block ACommitment, Exhibit A
4Lien to be released$7,889,000Commitment, Sch. B-I, p. 2
5Exceptions to coverage7Commitment, Sch. B-II, pp. 3 to 4
A recorded lease ahead of your lienException 7
The antenna tenant's memorandum of lease was recorded in 2023, before your deed of trust will be. The tenant's estoppel confirms the lease. Requiring subordination, or accepting it as a prior exception, is a call for your counsel.
Sch. B-II, p. 4Estoppel, p. 1
What a credit officer checks on a title commitment

Items to settle between the commitment and the funded loan.

The checks your team and your counsel run on a commitment, with the result on the illustrative 96-unit refinance. Every figure on this page comes from the same file as the rent roll and the T-12.

THE CHECKON THE SAMPLE FILE · ILLUSTRATIVE
Vesting against the borrower
The owner of record on Schedule A, set beside the borrower on the term sheet and the authority documents.
TIES OUT
Vested in Sample Apartments Owner, the borrower named on the term sheet. Authority documents for whoever signs are requirement 5.
Commitment, Sch. A, p. 1Sch. B-I, p. 2Term sheet
Insured amount and proposed insured
The policy amount against the loan, and your institution named as proposed insured with its successors and assigns.
TIES OUT
$9,000,000, the full loan, on a loan policy that names the lender, its successors and assigns.
Commitment, Sch. A, p. 1Term sheet
Legal description against the survey
Schedule A's land, set beside the survey's description, with each recorded easement located on the survey.
TIES OUT
Lot 1, Block A on both. The survey shows the 10-foot utility easement on the rear line, exception 4, and no encroachments. The general survey exception stays until the survey reaches the title company.
Commitment, Exhibit ASurvey, sheet 1
Liens and their priority
Every recorded lien, the payoff that releases it, and anything left ahead of your deed of trust.
TIES OUT
One deed of trust and assignment of rents to the bridge lender, recorded for $7,889,000 and released from the $7,886,930 payoff. The $600,000 mezzanine loan is secured by the ownership interests, not the land, so it is off title; its own payoff letter confirms the figure. 2026 taxes, $150,000 a year on the T-12, are a lien not yet due.
Sch. B-I, p. 2Payoff lettersT-12, p. 3
Schedule B exceptions
Each exception the policy will not cover, read against the leases, the survey and the loan.
FLAGGED
Seven exceptions. The memorandum of the rooftop antenna lease was recorded in 2023, before your deed of trust will be. Whether to require subordination goes to your counsel.
Sch. B-II, pp. 3 to 4Estoppel, p. 1
Requirements and endorsements
What the title company needs before it issues the policy, and the endorsements your closing instructions ask for.
ON THE RECORD
Five requirements, from the bridge release to the authority documents, each a condition to clear before funding. Five endorsements requested, all five on the pro forma policy. Title and legal costs sit inside the $63,000 of third-party costs.
Sch. B-I, p. 2Pro forma policySources and uses
What LenderBox returns

Schedule A and Schedule B, set against the rest of the file.

Your team starts from every title item cited to its page and set beside the term sheet, the survey, the payoff letters and the leases, with each difference and its reason.

CITED TO THE PAGEEach Schedule A and Schedule B item points to its page in the commitment.
DIFFERENCES, WITH BOTH PAGESA vesting, amount or lien that disagrees with the file shows both pages and the reason, and your team and counsel decide on the cure.
HELD FOR A PERSONA title item read with low confidence is held until your team confirms it, and the review stays open.
CURRENT, OR ASKED FOR AGAINA commitment past its effective-date window is flagged before closing, so an updated one can be ordered.
See document review on a full file →
WHERE THE FIGURES GO · ILLUSTRATIVESAME SAMPLE FILE
Payoff, insured amount, counsel and memo
SOURCES AND USESBridge payoff $7,886,930 against the $7,889,000 recorded lien
Sch. B-I, p. 2Payoff letter
COLLATERALInsured amount $9,000,000, equal to the loan
Commitment, Sch. A, p. 1
FOR YOUR COUNSELException 7, with the estoppel page beside it
Sch. B-II, p. 4Estoppel, p. 1
CREDIT MEMOCollateral section drafted with vesting, insured amount and open exceptions, each cited

Between the commitment and the policy, your team and counsel decide what stands.

Reading the commitment
LENDERBOX DOESReads Schedule A, both parts of Schedule B and the exhibits, each item cited to its page.
STAYS WITH YOUR TEAMWhich title company and which policy form your institution uses.
Against the file
LENDERBOX DOESSets vesting, the amount, the land and the liens beside the term sheet, the survey and the payoff letters, and flags each difference with the reason.
STAYS WITH YOUR TEAMWhich differences must be cured before closing.
Exceptions
LENDERBOX DOESLists every exception, each cited to its page.
STAYS WITH YOUR TEAMWhich exceptions to accept, and which endorsements to require.
Legal sufficiency
LENDERBOX DOESHolds the commitment and each difference on the file.
STAYS WITH YOUR TEAMWhether title is acceptable and your lien has the priority you need: a legal conclusion that stays with your counsel.
The memo
LENDERBOX DOESDrafts vesting, insured amount and open exceptions into the collateral section.
STAYS WITH YOUR TEAMWhether the open exceptions change the vote.

Title, from the first commitment to the recorded deed of trust.

01 · FIRST LOOKPolicy flags and a first size arrive before anyone has ordered title.
02 · UNDERWRITINGThe commitment is read beside the term sheet, the survey and the payoff letters.
03 · CREDIT DECISIONCommittee sees vesting, the insured amount and any exception that touches the collateral.
04 · CLOSING · THIS DOCUMENTSchedule B requirements and endorsements clear before closing.
05 · LIFE OF THE LOANOnce the loan funds, covenant monitoring, reporting dates and annual reviews stay in view.

Title commitment questions, briefly

What does LenderBox pull from a title commitment?

Schedule A: the effective date, policy, proposed insured, amount, estate, vesting and land. Schedule B: every requirement and every exception, plus the exhibits. Every item carries its page number.

Is the insured amount checked against the loan amount?

Yes. Vesting, the insured amount, the land and the liens are set beside the term sheet, the survey and the payoff letters, and every difference comes with the reason and both pages.

Who signs off on title?

Your counsel. Whether title is acceptable, and whether your lien has the priority you need, is a legal conclusion. LenderBox hands counsel each item with its page and every difference from the file.

Can the commitment arrive as a scan?

Yes. A scanned or PDF commitment is read in the title company's own layout, and any item read with low confidence waits for your analyst.

Does it tie the payoff to the recorded lien?

Yes. On the sample, the $7,886,930 bridge payoff sits against the $7,889,000 recorded lien, both pages shown.

Show us the commitment with the longest Schedule B.

Bring the commitment, the survey and the payoff letters. The demo can run on your own deal documents, Schedule B included.

See it on your deal
30 MINUTES. NO COMMITMENT. 90-DAY MONEY-BACK GUARANTEE.
Not ready to talk? See pricing