Construction loan underwriting software

Construction loans, with every draw on the record.

LenderBox's construction loan underwriting tests completion risk before the first draw. The budget is reconciled to the contract and bids, contingency is held to your minimums, and the schedule is set against the term and interest reserve. After closing, each draw is read against the budget, prior draws and the inspection, with retainage tracked.

CONSTRUCTION REVIEW · ILLUSTRATIVEYOUR CREDIT BOX
Sizes at 65% of cost, with thin contingency
Loan to costInside the box
Loan to completed valueInside the box
Guarantor liquidityInside the box
Contingency, schedule, costFor committee

From first budget to final draw, nothing slips.

Budget and draws in view
Draws matched to verified work, with the budget in balance.
Sponsor and guarantor strength, checked
Liquidity, experience and other projects read together.
Your construction policy, line by line
Contingency under your minimum is flagged before the first draw.
Draws watched to completion
Key dates, draws and annual reviews stay in view through conversion.

The risk in the budget, the schedule and the people.

The budget, the schedule and the people behind the project are read against your credit box before closing and again at every draw. Pre-development, mini-perm and C-PACE structures are covered too.

A budget that does not add up
The budget, the contract and the bids are reconciled line by line, and gaps are shown with their source.
WHAT IT MEANS FOR YOUYour team funds against a budget that has been tested.
Contingency below your policy
Hard and soft cost contingency are measured against your minimums.
WHAT IT MEANS FOR YOUA thin cushion is on the record before the first draw.
A schedule with no room
The construction timeline is set against the loan term and the interest reserve.
WHAT IT MEANS FOR YOUYou see how many months of delay the loan can absorb.
Equity that is not in yet
Sources and uses are checked for the timing and proof of the borrower's equity.
WHAT IT MEANS FOR YOUYour dollars go in after theirs, as your policy requires.
A draw that outruns the work
Each draw request is read against the budget, prior draws and the inspection.
WHAT IT MEANS FOR YOUOverfunding is caught at the draw, when it can still be corrected. Retainage is tracked on every draw, so you know what is held back until completion.
A guarantor stretched across projects
The guarantor's liquidity is set against obligations on other projects.
WHAT IT MEANS FOR YOUThe answer reflects who stands behind completion.
What the answer looks like · illustrative

An $18.2 million build with 3% contingency in the budget

A developer is building 120 apartments at a total cost of $28.0 million and asks for an $18.2 million loan. Your underwriter has the budget reconciled by early afternoon. The deal, the figures and the policy limits are invented for illustration.

CONSTRUCTION · 120-UNIT MULTIFAMILY · $18.2M LOAN REQUESTEDFILE RECEIVED 7:50 AM · ANSWERED 1:30 PM, SAME DAY
LENDERBOX ANSWER
The loan sizes, and $5.6 million of equity goes in before the first draw. Contingency, schedule and cost need a decision.
INSIDE YOUR CREDIT BOX
Loan to cost65%
✓ Inside your 70% limitSources and uses, p. 1
Loan to completed value54%
✓ Inside your 65% limitAppraisal, p. 63
Guarantor liquidity$2.1M
✓ Above your minimum of 10% of the loanPersonal financial statement, p. 2
FOR COMMITTEE, ON THE RECORD
Hard cost contingency3%
Outside your 5% minimum.
Budget, line 41 · Policy §7.2
Schedule cushion4 months
A 20-month build on a 24-month term. Your policy asks for six months.
Construction schedule, p. 1 · Policy §7.5
Hard cost per unit11% below
The budget sits 11% under comparable recent projects in this market.
Budget, p. 2 · Market data
WHAT YOUR TEAM DID NOT HAVE TO DO
✓Retype the budget✓Reconcile bids to the contract✓Find Policy §7.2 and §7.5✓Size the interest reserve✓Compare unit costs to recent projects

Budgets reconciled, draws checked against the work, completion risk in view.

Each budget line is matched to the contract and bids, and each draw to the inspection, so thin contingency or a short cushion is on record before funding.

Answer to the developer
TODAYWeeks of review, line by line through the budget.
WITH LENDERBOXWithin the day, with every budget line already reconciled to the contract.
The budget
TODAYChecked by hand against the contract when time allows.
WITH LENDERBOXReconciled line by line on every deal.
Draws
TODAYReviewed one at a time, from a spreadsheet.
WITH LENDERBOXEach draw read against the budget, prior draws and the inspection.
Contingency below policy
TODAYFound when the first change order arrives.
WITH LENDERBOXOn record before the first draw, against your 5% minimum.
When the draws are audited later
TODAYDraw files rebuilt from email threads.
WITH LENDERBOXEach draw beside the budget and inspection it used.

Faster draws for the developer, with the source and reason behind each one.

"Within a couple hours of running it through LenderBox, we're able to find all those inconsistencies, all those flags that come up."
CEO, private credit lender and CRE capital advisory firm
Also built for

Every commercial loan, one platform.

Budgets, draws and conversion, for construction lenders

Does LenderBox review construction draws?

Yes. Each draw request is read against the budget, prior draws and the inspection, and anything out of line is flagged before funding.

Does LenderBox check the budget against our policy?

Yes. Contingency, equity timing, loan to cost and loan to completed value are tested against your credit box, and each exception is tied to its policy section.

What does the construction loan memo cover?

A memo with the reconciled budget, the results against your credit box, the schedule and reserve analysis, and each exception with its reason, all cited to source.

How long does a construction loan review take?

Review that used to take weeks comes back the same day. Later draws are read against the budget and inspection.

Who approves a draw?

Your team. Each draw request is read against the budget, prior draws and the inspection, and anything out of line is flagged; funding stays your call.

Does LenderBox check the developer's equity?

Yes. Sources and uses are checked for the timing and proof of the borrower's equity. On the 120-unit project, $5.6 million of equity goes in before the first draw, as your policy requires.

What happens from the first draw to conversion?

Each draw is read against the budget, prior draws and the inspection through completion, and covenant monitoring keeps key dates and reviews in view for the life of the loan. At completion, you see whether the loan passes its conversion test before it moves to permanent terms. Conditions on the approval, such as equity in before the first draw, start as items on the closing checklist. See covenant and portfolio monitoring.

Your construction budget, checked line by line.

Bring a budget, the contract and a draw request from a project in your pipeline. The demo can run on your own documents.

Bring a deal
30 MINUTES. NO COMMITMENT. NO LONG-TERM CONTRACTS. 90-DAY MONEY-BACK GUARANTEE.
Not ready to talk? See pricing