Line by line, LenderBox reconciles the construction budget with the contract and the bids before the first draw. Hard and soft cost contingency is held to your minimums, the interest reserve is measured against the schedule, and each figure is cited to its page. Your construction desk keeps every judgment call.

CONSTRUCTION BUDGET · ILLUSTRATIVE120 UNITS · $28.0M PROJECT
The budget at loan closing, line by line
PROJECT BUDGET · 120-UNIT MULTIFAMILY, GROUND-UP · PAGES 1 TO 3
LAND AND HARD COSTS
LINEBUDGETSPENTTO FINISH
LandAcquisition3,000,0003,000,0000
Site workHard1,800,00001,800,000
Building, 120 unitsHard16,400,000016,400,000
General conditions, feeHard1,800,00001,800,000
2Contingency, 3%Line 41600,0000600,000
1Total hard costs20,600,000020,600,000
SOFT COSTS
Architecture, engineering900,000900,0000
Permits and impact fees600,000300,000300,000
Legal, insurance, taxes563,0000563,000
Developer fee840,0000840,000
Loan fee, 1%182,0000182,000
3Interest reserve1,315,00001,315,000
Total soft costs4,400,0001,200,0003,200,000
4Total project cost28,000,0004,200,00023,800,000
FUNDING AND TERMS · PAGE 3
Construction loan, 65.0%18,200,000
5Borrower equity, 35.0%9,800,000
Retainage on hard cost payments10% to completion
READ FROM THIS DOCUMENT, EACH FIGURE CITED
1Hard costs$20,600,000 · $171,667 a unitBudget, p. 2 · Contract, p. 1
2Hard cost contingency$600,000 · 3%Budget, line 41
3Interest reserve$1,315,000Budget, p. 3
4Total project cost$28,000,000Budget, p. 3 · Sources and uses, p. 1
5Borrower equity$9,800,000 · $4,200,000 spentSources and uses, p. 1 · Paid invoices
Contingency below your minimum$400,000
The budget carries 3% of the $20,000,000 contract, $600,000. Your policy asks for 5%, $1,000,000, so the cushion starts $400,000 short, with no soft cost contingency behind it.
Budget, line 41Policy §7.2
What a credit officer checks on a construction budget

Questions a budget answers before the first draw.

Each check sets the budget beside the contract, the schedule, the appraisal or your policy. The results come from the illustrative 120-unit construction loan.

THE CHECKON THE SAMPLE FILE · ILLUSTRATIVE
Hard and soft costs
Hard costs should tie to the signed contract and the bids; soft costs should carry every fee, tax and financing cost the loan will pay.
TIES OUT
Hard costs $20,600,000, 73.6% of cost: the $20,000,000 contract plus contingency. Soft costs $4,400,000, 15.7%, with the loan fee and the interest reserve inside. Land $3,000,000.
Budget, pp. 1 to 3Contract, p. 1
Contingency share
Contingency as a share of hard costs, against your minimum, with any soft cost contingency beside it.
FLAGGED
3% of the $20,000,000 contract, $600,000, against a 5% minimum of $1,000,000: $400,000 short. No soft cost contingency.
Budget, line 41Policy §7.2
Interest reserve against the draw forecast
The reserve should carry the projected interest on the loan as it funds, until the property can pay its own.
FLAGGED
$1,315,000 against $1,310,141 projected at 8.00% to month 24: $4,859 to spare. The 20-month build leaves four months before maturity; your policy asks for six.
Budget, p. 3Schedule, p. 1Policy §7.5
Retainage
The share of each contractor payment held back until completion, as the budget and the contract state it.
ON THE RECORD
10% of each hard cost payment is held to completion. Retainage changes when cash moves, so the undrawn loan must still cover it at the end.
Budget, p. 3Contract, p. 4
Cost to complete, equity first
What is left to spend, against the undrawn loan and the equity still to go in, with the borrower's money going first.
TIES OUT
$23,800,000 left to spend against $18,200,000 of loan and $5,600,000 of equity still to go in: in balance. $4,200,000 is already spent on land, design and permits, and the loan first funds in month 5.
Budget, p. 3Sources and uses, p. 1
Budget against the appraisal and the market
Cost and loan set beside the completed value, and hard cost per unit beside comparable projects.
ON THE RECORD
The loan is 54.0% of the $33,700,000 completed value, inside your 65% limit, and total cost is 83.1% of that value. Hard cost per unit runs 11% below comparable recent projects, marked as market data from third-party data providers.
Appraisal, p. 63Budget, p. 2Market data
What LenderBox returns

A tested budget for the first draw.

The budget arrives reconciled and measured against your policy, with every figure cited to its page.

RECONCILED LINE BY LINEThe budget, the contract and the bids are reconciled line by line, and gaps are shown with their source.
MEASURED AGAINST YOUR MINIMUMSHard and soft cost contingency are measured against your minimums, so a thin cushion is on the record before the first draw.
SET AGAINST THE SCHEDULEThe construction timeline is set against the loan term and the interest reserve, so you see how many months of delay the loan can absorb.
EACH DRAWEach draw request is read against the budget, prior draws and the inspection, retainage is tracked on every payment until release, and anything out of line is flagged before funding.
See the full construction loan review →
WHERE THE FIGURES GO · ILLUSTRATIVESAME SAMPLE FILE
Loan to cost, completed value, sizing, memo
LOAN TO COST65.0% against your 70% limit
Sources and uses, p. 1
LOAN TO COMPLETED VALUE54.0% against your 65% limit
Appraisal, p. 63
MAXIMUM SUPPORTABLE LOAN$19,600,000, set by loan to cost; completed value alone would allow $21,905,000
CREDIT MEMOBudget, reserve and schedule analysis drafted with the recommendation

Your construction desk keeps the judgment calls.

Reading the budget
LENDERBOX DOESReads every line of the budget, the contract and the bids, and cites each figure to its page.
STAYS WITH YOUR TEAMWhich budget version is approved.
Contingency
LENDERBOX DOESMeasures hard and soft cost contingency against your minimums.
STAYS WITH YOUR TEAMWhether a thin contingency is offset by a guaranty, more equity or price.
Reserve and schedule
LENDERBOX DOESSets the interest reserve and the timeline against the loan term.
STAYS WITH YOUR TEAMHow much schedule risk the loan carries.
Draws
LENDERBOX DOESReads each draw request against the budget, prior draws and the inspection.
STAYS WITH YOUR TEAMWhether to fund the draw, and any reallocation between lines.
The memo
LENDERBOX DOESDrafts the budget, reserve and schedule analysis, each line cited.
STAYS WITH YOUR TEAMThe approval, and the conditions on it.

The budget at every stage of the loan.

01 · FIRST LOOKA summary budget with the request shows loan to cost and the equity before anyone opens the full file.
02 · UNDERWRITING · THIS DOCUMENTThe budget is reconciled to the contract and the bids, and contingency and the reserve are measured against your policy.
03 · CREDIT DECISIONCommittee sees the budget, the reserve and the schedule, with each exception tied to its policy section.
04 · CLOSINGRemaining $5.6 million of equity precedes any draw.
05 · LIFE OF THE LOAN · THIS DOCUMENTEach draw is read against the budget, prior draws and the inspection through completion, the conversion test is run against the loan agreement at completion, and covenant monitoring runs for the life of the loan.

Budget, reserve and draws

How much of the budget is read?

Every line: land, hard costs, soft costs, contingency, fees and the interest reserve, with what is spent and what is left to finish. Each figure is cited to its page, and the budget is reconciled to the contract and the bids.

Does it check contingency against our policy?

Yes. Hard and soft cost contingency are measured against your minimums. On the sample, 3% of the contract against a 5% minimum is flagged as $400,000 short, with the budget line and the policy section.

How is the interest reserve tested?

The construction timeline is set against the loan term and the interest reserve. On the sample, the $1,315,000 reserve covers projected interest to month 24, and the four months between completion and maturity are on the record against your six.

Does it review draws after closing?

Yes. Each draw request is read against the budget, prior draws and the inspection, and anything out of line is flagged before funding. Retainage is tracked on every payment until release, and at completion the loan is tested against the conversion conditions in your loan agreement. Your team decides whether to fund.

Do renovation budgets work the same way?

Yes. Renovation costs are read from the budget and bids and checked for gaps and missing contingency, and the interest reserve and renovation holdback are measured against the timeline in the plan.

Is the in-balance test run on the budget?

Yes. On the sample, the $23,800,000 left to finish equals $18,200,000 of loan still to fund plus $5,600,000 of equity still to go in, so the budget is in balance.

A budget, its contract and one draw request is enough.

The demo can run on your own deal documents: the budget comes back reconciled to the contract, with contingency and the reserve measured against your policy.