Loan to Cost (LTC)

Loan to cost is the loan amount divided by the total cost of a project, including acquisition, hard costs and soft costs, and it shows how much of the money going into the property is the lender’s.

Formula

What is the loan to cost formula?

Loan to cost (LTC) = loan commitment / total project cost

Combined LTC = (senior commitment + subordinate debt) / total project cost

  • Loan commitment: the full amount the lender has agreed to fund, including amounts held back for future draws and the interest reserve, because the lender will fund all of it.
  • Total project cost: the purchase price or land cost, acquisition closing costs, hard costs including contingency, and soft costs including fees and any interest reserve.
  • Subordinate debt: any mezzanine loan or other debt that sits behind the senior loan.

How does loan to cost work on a sample renovation?

Illustrative figures. Before the $9.0 million refinance, the sponsor bought the 96-unit community for $7,600,000 and renovated it with a bridge loan and a mezzanine loan.

Cost bucketAmount
Purchase price and acquisition closing costs$7,752,000
Hard costs, including a $144,000 contingency$1,584,000
Soft costs, including the $605,000 interest reserve$749,890
Total project cost$10,085,890

Senior LTC: $7,889,000 commitment / $10,085,890 = 78.2 percent.

Combined LTC with the $600,000 mezzanine loan: $8,489,000 / $10,085,890 = 84.2 percent.

Sponsor equity: $10,085,890 - $8,489,000 = $1,596,890, or 15.8 percent of cost.

At the refinance, the new $9,000,000 loan is 89.2 percent of the original $10,085,890 cost basis and 72.0 percent of today's $12,500,000 value.

How do lenders use loan to cost?

On a construction, renovation or bridge loan, the stabilized value is a projection, while the cost can be checked against a budget, contracts and invoices. LTC measures the sponsor's cash at risk ahead of the lender, which is the first cushion if the business plan runs late or over budget. Many lenders set an LTC limit alongside a limit on loan to as-stabilized value and size the loan to whichever is lower, so a loan that clears the value test on a generous appraisal can still be cut back on cost.

Typical policy treatment (illustrative): the sample bridge lender caps senior LTC at 80 percent and combined LTC, with mezzanine, at 85 percent. The sample deal is at 78.2 percent and 84.2 percent.

Where does loan to cost go wrong?

  • Counting a deferred developer fee or land at appraised value as cost, which raises the denominator and makes the sponsor's cash look larger than it is.
  • Leaving the interest reserve or loan fees out of cost while including them in the loan, which mismatches the ratio.
  • Reporting only senior LTC when mezzanine or preferred equity sits behind it.
  • Testing LTC once at closing and never again after change orders use up the contingency.

Where does LTC sit in the credit memo?

Loan to cost sits in the loan structure and sources and uses section, beside loan to as-is and as-stabilized value, with the budget and the equity verification as source documents. A miss against the policy limit is written up as a policy exception with the mitigant, often additional equity or a completion guaranty.

Related terms

Sources and uses, hard and soft costs, contingency, interest reserve, loan to value.

Where LenderBox does this work

On construction and renovation loans, LenderBox reads the budget, the schedule and the people against your credit box and keeps reading through every draw, so your team sees loan to cost against your limit at closing and as the budget moves.

See it worked on a deal you bring.

A 30-minute demo can run on documents you bring: LenderBox reads the file, shows the source page behind each figure, and checks the result against your credit policy.

See it on your deal
30 MINUTES. NO COMMITMENT. 90-DAY MONEY-BACK GUARANTEE.